Loading...

Relamping and Photovoltaic System Project at FLECTE SRL

Eventi
Relamping fotovoltaico Photovoltaic

since 02/10/2026

Relamping and Photovoltaic System Project at FLECTE SRL

Funded by the Lombardy Region’s Regional Programme under the European Regional Development Fund (ERDF) 2021–2027 (PR FESR 2021–2027)

Action: Support for SME investments | Call for Proposals: “INVESTMENTS – MICRO-ENTERPRISES LINE” Measure

Beneficiary: FLECTE S.R.L.

Description: FLECTE S.r.l.’s investment at its Travagliato (BS) site involves an energy efficiency upgrade comprising the replacement of existing lighting with new high-efficiency LED fixtures, and the installation of a 24.75 kWp photovoltaic system and a 15 kWh energy storage system. The project aims to reduce the company’s energy consumption, increase the self-generation and self-consumption of energy from renewable sources, and improve the business's environmental sustainability. The lighting replacement is expected to yield annual energy savings of 0.27 TOE (Tonnes of Oil Equivalent).

Total amount: €48,877.60

Grant awarded or disbursed: €24,438.80